eFUND – comprehensive software solution for People’s Credit Fund (PCF), has been greatly supporting People’s Credit Funds in delivering their best financial services to end-customers. eFUND provides better and more efficient assistance for PCFs’ operational staff’s performance. This solution particularly enhances supervision and control of People’s Credit Funds’ board of management over their business activities and safety …
Business evolvements lead to continuous new products to be launched into markets as well as new operational and managerial requirements raised by People’s Credit Funds. The software solution, thereby, has to be upgraded to catch up with such business movements.
From that point of view, NGV introduces the eFUND ON – DEMAND Package which is specially designed and guaranteed by NGV in terms of delivery timelines and project quality.
This On-Demand Package of eFUND shall include such operational modules as follow
- System Management;
- Common parameter Management;
- Customer Management;
- Fund Advance Management;
- Member and Shared Capital Management;
- Limit Management;
- Interest Management;
- Savings and Deposit Modules (Including installment saving/deposit);
- Credit/Loan Modules (including Installment Credit/Loan);
- Accountings and Control;
- MM – Deposit/Borrowings at/From Other Credit Institution;
- Cashiers’ Operations;
- Account Transfer;
- Image Signature;
- Ready – use Credit Contract Samples
- Datamining – Financial Reporting;
- Datamining – Statistical Reporting under Circular 31;
- Datamining – Deposit Insurance Reporting;
- Datamining – Credit Information (CIC) Reporting;
- Data mining – Inspection and Control Reporting
- Data mining – Others;
- Single Door transaction counter;
- Wages and Salaries;
- Fixed Asset management
- Tools and equipment Management
- Accessories Management
- SMS Banking
- Data mining- Others
Implementation Methodology
Onsite implementation with Scope of actual project implementation Works includes:
-
- Make and Unify Project plan
- System Survey (before onsite implementation)
- Consolidate and analyze users’ requirements;
- Develop and test the proposed system;
- System configuration and set-up;
- Operational training and Tech-transfers;
- Data Conversion and Reconciliation;
- Pilot operational support;
- UAT and Contract liquidation;
- Receive, consult claims/request; fix bug and upgrade
Implementation Duration
- Finish basic features: within 10 months;
- Particular added changes: from 3-09 months in receipt of such requests
- The timeline depends on the complexities of the change request.
Hand-over
- 03 set of Installation and Manual guide CD;
- 05 set of Operational Book;
- 01 Certificate of Usage License.
Package price
- 179.500.000 VNĐ –
205.000.000 VNĐ(VAT included of License and Implementation Fees). - Not only applied for Headquarter but also for unlimited transaction counters.
Extra requirements (out of existing Basic operational modules’ functions)
- Free of charge during implementation; warranty and maintenance
Method of Payment
- Account transfer.
Client may adopt either
- Normal Maintenance: for all functions and features within the above set of operational modules which have been implemented as it is at the point of hand-over: 18% of Contract value;
- On –Demand Maintenance: for all functions and features within the above set of operational modules which have been implemented or will be implemented after hand-over and during the maintenance: 35% of Contract value
Vũ Thế Minh (Mr.) – Business Manager |
|
Addr.: | Tầng 5, Tòa nhà VaPa, Ngõ 3 – Tôn Thất Thuyết, Dịch Vọng, Cầu Giấy, Hà Nội. |
Tel: | (+84) 2473068000 và 02473069000 |
Fax: | (+84 4) 3312 0994 |
Mobile: | 0987 276 990 or Hotline : 0944 213 993 |
E-mail: | minhvt@ngvgroup.vn |
website: | www.ngvgroup.vn |